Creating Flow in the yard for Foodstuff Inc. Logistics Operation

Case Study Creating Flow in the yard for Foodstuff Inc

To see the full case study, click the green download button in the column.

  • Reduction in overtime costs of £75k
  • 4% increase in delivery capacity per shift
  • Elimination of 2 trailers resulting in annual savings of £54k

To see the full case study, click the green download button in the column.