To see the full case study, use the download link provided.
Some benefits gained:
- Visual management allowing lead time to be reduced from > 50 days to 16 days.
- A redesigned workspace that supported the smooth ‘flow’ of files through the process reduced WIP from 300 to 25.
- Visual management allowing lead time to be reduced from > 50 days to 16 days.