Delivering Enterprise Excellence at Vale Clydach

Case Study Delivering Enterprise Excellence at Vale Clydach

To see the full case study, click the green download button in the column.

  • A 111 year production high in 2013 of 93 million Lbs
  • 20% reduction in costs / tonne manufactured
  • Zero lost time in injuries 2010, 2011, 2013
  • 95% of all waste recycled
  • Shingo Silver Medallion Winner 2014

To see the full case study, click the green download button in the column.