To see the full case study, use the link provided.
- Stabilised the variation in production lead time of camper production from 3-12 weeks to 3 weeks production cycle
- Reduced production cycle from 3 weeks to 3 days
- Reduce the lead time of swag production from 3 weeks to 2.6 day