Level Loading in a National Distribution Centre (NDC) for Foods

To see the full case study, click the green download button in the column.
- Reduction in agency and overtime working costs of £255k
- CAPEX cost avoidance for new kit of £75k
- Reduction in operating maintenance cost of £6240 per annum
To see the full case study, click the green download button in the column.